PROFESSIONAL INSTALLATION

A structured process from assessment to a fully tested, driver-ready system.

Every APU Monster system is professionally mounted, integrated, tested and inspected before the truck returns to the road.

01 Mount Unit02 Integrate03 Connect04 Test
STEP 01

Exterior cooling unit installation.

The 15,000 BTU electric cooling unit is securely mounted to the sleeper wall with protected cable routing and service access.

APU Monster 15,000 BTU exterior electric cooling unit installed on a sleeper truck
STEP 02

Electrical system integration.

Technicians mount the system hardware, route protected high-current cabling and connect every component for safe, reliable operation.

Two APU Monster technicians installing the electrical cooling system on a blue semi truck
STEP 03

Internal components and final connections.

The battery bank, DC-to-DC charger, inverter and control connections are positioned for protection, airflow and straightforward service access.

APU Monster technician fitting an electrical system component inside a truck side compartment
STEP 04

Testing, inspection and driver handoff.

Before delivery, the complete installation is inspected and tested for charging, electrical output, cooling performance and road-ready reliability.

Electrical inspectionCooling performance testCharging verificationFinal road-ready inspection
APU Monster installation and service team standing beside a completed truck installation
SERVICE NETWORK

Support after installation.

Training is included with every order — installation, maintenance, operation and repair, delivered on-site and online. A current list of service locations will be published as coverage is confirmed.

Ready to upgrade your truck?

Professional installation. Premium components. Built for years of reliable operation.